Dyno Nobel 390 TPD Nitric Acid Plant – Acquisition ^0 Equipment Loadout

Author
Ira Pollack
Published:January 10, 2014

Project Overview

Dyno Nobel had an idled 390 TPD nitric acid plant stored in Port Ewen, New York after plans to reuse the facility were cancelled. Dyno Nobel had dismantled and relocated the plant from the Radford Army Ammunition Site to Port Ewen in 2007 for a project that was later cancelled.

Phoenix Equipment purchased the complete dismantled plant and assumed responsibility for loading out all of the stored equipment. The approximately $1.5 million project ran from February through October 2013.

The Challenge

Although the nitric acid plant had already been dismantled, Dyno Nobel still had approximately 750 tons of equipment occupying storage space that it wanted available for future needs. Dyno Nobel needed a buyer for the complete plant and a way to clear the stored equipment from the site.

Plant Acquisition & Equipment Loadout

Phoenix purchased the complete 390 TPD nitric acid plant and coordinated the loadout of approximately 750 tons of dismantled process equipment from the Port Ewen storage location, allowing Dyno Nobel to recover value from the shelved plant while clearing the space at no cost.

Project Highlights

  • Client: Dyno Nobel
  • Location: Port Ewen, New York
  • Facility: Nitric Acid Plant
  • Plant Capacity: 390 TPD
  • Original Location: Radford Army Ammunition Site
  • Relocated by Dyno Nobel: 2007
  • Plant Status: Dismantled and Stored After Cancellation of New Project
  • Equipment Loadout: Approximately 750 Tons (See Liquidation)
  • Phoenix Scope: Plant Acquisition and Equipment Loadout
  • Project Timeframe: February 2013 – October 2013
  • Project Value: Approximately $1.5 Million
  • Owner Outcome: Significant Value Recovered / Storage Space Cleared at No Cost

Recovering Value From a Shelved Plant

The Dyno Nobel project gave the company a way to recover value from a plant it no longer planned to use while freeing a large amount of storage space. Phoenix purchased the complete dismantled facility and removed approximately 750 tons of equipment, leaving the storage area available for Dyno Nobel’s future needs.

 